Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

हम हवाई जहाज़ उड़ाने वाले, फिर भी फ़िदा हैं, पटरी में दौड़ने वालों पे. - SK Mangla

Search Forum
<<prev entry    next entry>>
Blog Entry# 4414771
Posted: Aug 31 2019 (14:47)

10 Responses
Last Response: Sep 20 2019 (22:02)
General Travel
21578 views
3

Aug 31 2019 (14:47)   LKO/Lucknow Charbagh NR (9 PFs)
guest   0 blog posts
Entry# 4414771            Tags   Past Edits
#1 Lucknow De-Congestion Plan(Both NR and NER)-
1)Shifting All and Every Trains Going From Cnb-Bbk to be diverted via Aishbagh Trains That can be Shifted-Arunachal,Gkp & Champaran HS,Sabarmati,Kaifaayat,Barauni Mail,Panvel and many other Weekly Trains and all memu trains from cnb.
2)Shifting Trains like Gomti and Lko ac express which can easily have ljn ner as their terminal and some trains to aishbagh that go towards daliganj and orignate and ljn ner.
3)
...
more...
Divert Kgm Garibrath via sitapur,sidhauli and have a loco reversal of gomtinagar express at daliganj or aishbagh.
4)2nd line from aishbagh to manaknagar.
5)Yard Re-Modelling of lko nr and adding some platforms(Proposed In Pink Book) ASAP.
This is a series of suggestions for Many Congested Stations.It is my personal opinion and maybe many people may disagree and say i have no knowledge, so lets have a coversation in the reply section.

Translate to English
Translate to Hindi

5 Posts

8455 views
2

Sep 11 2019 (19:54)
Rohit_2912~
Rohit_2912~   679 blog posts
Re# 4414771-6              
1. 2 more PF at LKO.
2. Quadrupling tracks between LKO and dilkusha and LKO and alambagh west cabin
So that all 4 routes have separate lines and no disturbance from each other.
3. All terminating trains at LKO from CNB and MB side should terminate at LJN.
4.
...
more...
All terminating trains at LKO from GD and Faizabad side should terminate at GTNR and LJN.
5. GTNR should have 5 running lines with 3 PFs for running trains and 3 PFs for terminating trains
6. Daliganj - Malhour doubling and Malhour BBK quadrupling.
7. Malhour to Amausi bypass line for freights and meeting with Utratia to Alamnagar freight bypass line.
8. It is almost impossible to double the Aishbagh Manaknagar line.
9. However a new CNB ganga bridge should be made.
10. Triple line between amausi and manaknagar
This is my 10 point plan for LKO redevelopment.
After, all of this is executed LKO station will be so smooth, trains will reduce their delay while crossing Lucknow

Translate to English
Translate to Hindi

6793 views
0

Sep 20 2019 (16:28)
DevR
DevR   0 blog posts
Re# 4414771-7               Past Edits
I think Malhour BBK line Quadrupling is not in sight of railway... Railway is acting slow in tripling and Quadrupling of existing congested double lines 😆 so maybe we should reduce our demand to Malhour Barabanki line to triple it
But It is very urgent to build Quadruple line Between Lko to Dilkusha cabin and Railway should atleast make a plan for it 🙄 They are ignorant about LKO.
Average 45 - 60 min Stoppage in LKO outer every time I traveled from here 😏
Translate to English
Translate to Hindi

6606 views
0

Sep 20 2019 (16:33)
DevR
DevR   0 blog posts
Re# 4414771-8               Past Edits
this is the situation at Present, after Bypassing few trains, if Aishbagh Badshahnagar bypass had not opened situation would be much more excruciating 🤦‍♂️
Translate to English
Translate to Hindi

6601 views
0

Sep 20 2019 (21:59)
Rohit_2912~
Rohit_2912~   679 blog posts
Re# 4414771-9              
Best performance at LKO outer that I have seen is by 12571 that did bbk to LKO in 37 minutes. It was running 80 minutes late from gd and arrived lko only 40 minutes late.
Non stop GD to LKO pf 5
Translate to English
Translate to Hindi

6629 views
0

Sep 20 2019 (22:02)
Rohit_2912~
Rohit_2912~   679 blog posts
Re# 4414771-10              
That's why malhour daliganj doubling is absolutely necessary for smooth flow of trains. I also think that they should have doubled the tracks from ljn to ash
Only a few meters of track and two switches will fulfill this and also solve the issue of track switch at aishbagh that trains like intercity and 15203 do at 10kmph consuming a lot of time.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy