Search Forum
Blog Entry# 4416629
Posted: Sep 02 2019 (14:04)
2 Responses
Last Response: Sep 02 2019 (15:03)
2 Responses
Last Response: Sep 02 2019 (15:03)
Sep 02 2019 (14:04) 17236/Nagercoil - SMVT Bengaluru Express (PT) | SA/Salem Junction (6 PFs) | ED/WAP-4
RVBRao~
RVBRao~ 320 blog postsIs there any technical reason why this train is not running with E-Loco btw SA-NCJ? - 426 KM long electrified route with no reversal!
Doubt if SA - DPJ - HSRA - BNC - SBC route is electrified.
12678/77 ERS - SBC - ERS intercity Express too runs via this route with diesel loco. Earlier it used to run till/from ED with electric loco; but now runs end to end with diesel.
12678/77 ERS - SBC - ERS intercity Express too runs via this route with diesel loco. Earlier it used to run till/from ED with electric loco; but now runs end to end with diesel.
SA-BNC is under electrification along with Doubling until HSRA, I was referring to SA-NCJ section.
As the TT is itself quite slow with lots of slack, LC can be easily done at SA thereby saving lots of Fuel Cost.
As the TT is itself quite slow with lots of slack, LC can be easily done at SA thereby saving lots of Fuel Cost.