Search Forum
Blog Entry# 4482118
Posted: Nov 08 2019 (18:37)
51 Responses
Last Response: Mar 19 2020 (17:52)
51 Responses
Last Response: Mar 19 2020 (17:52)
Nov 08 2019 (18:37) 17308/Basava Express | MNL/Minchnal (2 PFs)
Siddheshwarexpress
Siddheshwarexpress 5968 blog postsMy biggest surprise in SWR route in Bijapur Solapur route..
Electric poles erected near Minchanaal station... Waiting for the Waps to arrive our pure Diesel territory....
Electric poles erected near Minchanaal station... Waiting for the Waps to arrive our pure Diesel territory....
50 Posts
Even before doubling completes electrification can take place if they know the proper alignment of the second line before the tracks are laid ohe work can be completed
Pls propose extension till SC via SUR and KLBG.. this will make train more profitable
Good news.. just saw a loco near New Bhima bridge... It's going to cross the bridge as I saw workers clearing the tracks on the other side of bridge....
Which is the other track located on the right side of the track where the loco is there. Is the bridge of triple line ?
Yes third bridge is being constructed . I think they will close the old bridge later when the third one is completed...