Search Forum
Blog Entry# 4513207
Posted: Dec 14 2019 (02:05)
1 Responses
Last Response: Dec 17 2019 (18:05)
1 Responses
Last Response: Dec 17 2019 (18:05)
SWR/South Western
Jayashree^ 51408 news posts
Some trains have been partially cancelled, regulated and diverted owing to railway related works at Yesvantpur bypass on December 15 from 10 a.m. to 6 p.m....
read more... Many trains partially cancelled, diverted
Atleast now, SWR should think of linking JTJ line to YPR line at SBC, by modifying back entrance area to bring JTJ line to PF 8+10 and/ or YPR line to PF 1 to 7.
This will give lot of flexibility to operate train via SBC.
Also, a link near Lottegollahalli for linking Hosur line to Yelahanka line. This will provide lot of flexibility to operate more trains from HOSUR side to YNK Doddaballapur, Airport.
This will give lot of flexibility to operate train via SBC.
Also, a link near Lottegollahalli for linking Hosur line to Yelahanka line. This will provide lot of flexibility to operate more trains from HOSUR side to YNK Doddaballapur, Airport.