Search Forum
Blog Entry# 4518473
Posted: Dec 20 2019 (11:47)
8 Responses
Last Response: Dec 22 2019 (07:34)
8 Responses
Last Response: Dec 22 2019 (07:34)
NWR/North Western
RamganjMandi~ 821 news posts
बाड़मेर से दिल्ली के बीच चलने वाली ट्रेन काे यहां से बंद करने का मूल कारण एलएचबी काेच है। अब यदि इस ट्रेन काे 15 मार्च...
2 Public Posts - Fri Dec 20, 2019
3 Public Posts - Sat Dec 21, 2019
One EOG is sufficient to power a full-length mixed LHB rake. The capacity is not an issue. The main problems are -
1) Backup - Every EOG coach has 2 diesel gensets, with one supposed to be used as a backup. When a train runs with 2 EOGs, usually one diesel genset from each EOG is used, while the other is left as a backup.
When one EOG is removed, while the rake can still work without any issues, the backup is lost now.
2)...
more...
1) Backup - Every EOG coach has 2 diesel gensets, with one supposed to be used as a backup. When a train runs with 2 EOGs, usually one diesel genset from each EOG is used, while the other is left as a backup.
When one EOG is removed, while the rake can still work without any issues, the backup is lost now.
2)...
more...
2 Public Posts - Sun Dec 22, 2019