Search Forum
Blog Entry# 451927
Posted: Jun 12 2012 (09:57)
4 Responses
Last Response: Jun 13 2012 (23:45)
4 Responses
Last Response: Jun 13 2012 (23:45)
11447 schedule clashes with 12308 in DHN-HWH section. I want IR to make a separate timing 4 11447 so that it's schedule doesn't clashes with any other train.
2 Public Posts - Wed Jun 13, 2012
I knw that but i m trying to tell that can't it's timing b reduced a bit?? U c it has been given 4 hr 40 min in DHN -HWH strech which is nt required since everytime it covers d strech much less than that.
1 Public Posts - Wed Jun 13, 2012