Search Forum
Blog Entry# 4529065
Posted: Jan 02 2020 (00:52)
47 Responses
Last Response: Jan 02 2020 (14:45)
47 Responses
Last Response: Jan 02 2020 (14:45)
Journey Date: Wed Jan 01
Number of Members on this Trip: 1
Ratnakar~
BDTS/Mumbai Bandra Terminus --> RJT/Rajkot Junction
Departure: Wed Jan 01 2020 @ 23:55
Train Status: 11m late
Last Update: @ WKR/Wankaner Junction @ Jan 02 2020 (11:42)
47 Posts
Welcome to IRI bro!
Arrived RJT RT...! Acchi train thhi. Detailed tip to be posted later
Yeah bro 🤘
How was the journey??? And how is Doubling+ Electrification work going on😁
Journey was very good..
Doubling - Digsar tak tracks laid, uske thodi door baad tak ground level sirf. Phir wahan se Wankaner tak sirf 1-2 small bridge ka kaam ho raha thha.., Wankaner to Rajkot also work in patches.. Tracks laid before Digsar only.. Work was going on.
Doubling - Digsar tak tracks laid, uske thodi door baad tak ground level sirf. Phir wahan se Wankaner tak sirf 1-2 small bridge ka kaam ho raha thha.., Wankaner to Rajkot also work in patches.. Tracks laid before Digsar only.. Work was going on.