Search Forum
Blog Entry# 4553445
Posted: Jan 31 2020 (07:15)
35 Responses
Last Response: Jan 31 2020 (10:06)
35 Responses
Last Response: Jan 31 2020 (10:06)
Journey Date: Fri Jan 31
Train Status: 6m late
Last Update: LBH/Dilkusha Cabin 3.2 km<--->0.4 km LKO/Lucknow Charbagh NR @ Jan 31 2020 (10:06)
Speed: 11 km/h
30 Posts
On Trip
Late: 7m late
LBH/Dilkusha Cabin 1.6 km<--->2.1 km LKO/Lucknow Charbagh NR
Speed: 9 km/h
halted at sadar
Posted thru Follow my Trip
Posted thru Follow my Trip
On Trip
Late: 13m late
LBH/Dilkusha Cabin 1.5 km<--->2.1 km LKO/Lucknow Charbagh NR
Speed: 1 km/h
departed
Posted thru Follow my Trip
Posted thru Follow my Trip