Search Forum
Blog Entry# 4557450
Posted: Feb 05 2020 (08:49)
4 Responses
Last Response: Mar 04 2020 (18:16)
4 Responses
Last Response: Mar 04 2020 (18:16)
➡️ Speed test conducted by the Railway Safety Commissioner was successful today with a maximum speed of 122 kms on the new (second) railway line at Perecharla-Satalur.
This will pave the way for the arrival of trains on the new (second) railway line between Perecharla-Satalur, with a maximum speed of 80 km per hour.
➡️ The first train to run on the new (second) railway line was yesterday's 17252 GNT - KCG Express. All remaining coaching / goods trains are running on the new (second) train line.
This will pave the way for the arrival of trains on the new (second) railway line between Perecharla-Satalur, with a maximum speed of 80 km per hour.
➡️ The first train to run on the new (second) railway line was yesterday's 17252 GNT - KCG Express. All remaining coaching / goods trains are running on the new (second) train line.
3 Public Posts - Wed Feb 05, 2020
Newly laid track always require soil settlement and soil takes time to settle. They will increase it progressively.