CRS central circuit Mr. Ak jain inspected joba - saraigram section of katni chopan section on 19 february 2020. Now only 49 km of electrification has left between katni mahdeiya
#katnisingraulielectrification
#katnisingraulielectrification
1 Posts
I am waiting for see Shaktipunj Express with ET/TKD WAP7 & BPL HWH Express with HWH WAP7 see😍😍😍
After electrification majority of ptru emd locos will be shifted to other zones and capacity of e-loco nearby sheds like mgs, nkj , tkd, tata, gmo , bndm, et , angul shed should be increased to meet the need to e-locos in this section , i always had a dream of seeing obra dam with a loco shed. it has location advantage and has a good big yard so i'm skeptical but its a wish .
After completion of lalitpur singrauli line this area definitely needs an els so railways should think about it