Search Forum
Blog Entry# 4652674
Posted: Jun 18 2020 (10:04)
15 Responses
Last Response: Jun 19 2020 (16:06)
15 Responses
Last Response: Jun 19 2020 (16:06)
New/Special Trains
ECR/East Central
Saharsarail~ 120 news posts
ट्रेनों के विस्तार, नई ट्रेनों के परिचालन की संभावनाओं को देखते हुए हर साल IRTTC की मीटिंग आयोजित की जाती है। 26 जनवरी से 28 जनवरी...
10 Posts
Timimg of shc bgp will revised before introduction of train, we ll demand to extend this train to deoghar
Darjeeling Mail has a connecting Toy Train which departs NJP at 09.00 hrs reaching DJ at 15.30 hrs. As for Kanchenjunga, Sikkim has no Railway lines.
On the other hand Mayurakshi River has Dam in Massanjore in Dumka region of Erstwhile West Bengal (Now Jharkhand). Massanjore Dam is maintained by WB Govt Water & Irrigation department under WB Irrigation Minister.
On the other hand Mayurakshi River has Dam in Massanjore in Dumka region of Erstwhile West Bengal (Now Jharkhand). Massanjore Dam is maintained by WB Govt Water & Irrigation department under WB Irrigation Minister.
Yes, it's correct,But Dumka was never a part of WB, it was a part of Santhal Parganas under the adminstration of the Bengal Presidency During British Era..