Search Forum
Blog Entry# 4656263
Posted: Jun 24 2020 (13:48)
17 Responses
Last Response: Sep 06 2020 (18:09)
17 Responses
Last Response: Sep 06 2020 (18:09)
Speed trial has now being done in Bandel - Katwa - Azimganj section.
Current trial speed:
Bandel - Katwa : 110 kmph (previously 100)
Katwa - Azimganj : 105 kmph (previously 95)
Azimganj -...
more...
Current trial speed:
Bandel - Katwa : 110 kmph (previously 100)
Katwa - Azimganj : 105 kmph (previously 95)
Azimganj -...
more...
13 Posts
Hate Bazare, Kamrup, Teesta Torsa, Radhikapur, Katihar, Garib Rath, Paharia, Balurghat - These all should have speed up in post covid situation and obviously in ZeroBased timetable. Let's hope for it only.
Great. Bandel - Dibrugarh is a highly utilized network or HUN 6. Expect the whole route to be doubled with significant speed up by 2024
Correctly said. Moving in the right direction.
Attached reference for all.
Attached reference for all.
Attached screenshot report was of 2018. Go through the details of it here click here