Search Forum
Blog Entry# 4671537
Posted: Jul 18 2020 (20:35)
51 Responses
Last Response: Jul 26 2020 (11:37)
51 Responses
Last Response: Jul 26 2020 (11:37)
Jul 18 2020 (20:35) 18047/Shalimar - Vasco-da-Gama Amaravati Express (PT) | VSG/Vasco-da-Gama (3 PFs)
Suri~
Suri~ 7928 blog postsThe Hyderabad slip coaches should be scraped and S10, S11, PC, and a general coach should be added on this train. Similarly the same should be done for Vasco NZM Goa express.
If Braganza ghats are not capable to bear the load of 24 coaches train, then instead of giving excuses, SWR should develop the section and should also develop the Vasco Da Gama station as a premier world-class terminal station.
Instead of Karmali/Madgaon, Vasco da Gama should be developed as a premium terminal station. If possible, a bypass line should...
more...
If Braganza ghats are not capable to bear the load of 24 coaches train, then instead of giving excuses, SWR should develop the section and should also develop the Vasco Da Gama station as a premier world-class terminal station.
Instead of Karmali/Madgaon, Vasco da Gama should be developed as a premium terminal station. If possible, a bypass line should...
more...
9 Public Posts - Sat Jul 18, 2020
19 Public Posts - Sun Jul 19, 2020
6 Public Posts - Mon Jul 20, 2020
3 Public Posts - Thu Jul 23, 2020
Supreme court banned Bellary mining way back in 2011 or 12 and that was the sole reason of railways to Scrap Talguppa Honnavar line..
But that doesn't mean mining isn't taking place much of bans have already been lifted.
Yes indeed SWR needs to develop the region.now the coach restrictions has also been increased
But that doesn't mean mining isn't taking place much of bans have already been lifted.
Yes indeed SWR needs to develop the region.now the coach restrictions has also been increased
1 Public Posts - Thu Jul 23, 2020
9 Public Posts - Sat Jul 25, 2020
3 Public Posts - Sun Jul 26, 2020