Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Champaran HumSafar Express : इन अजनबी सी राहों में, जो तू मेरा हमसफ़र हो जाये, बीत जाए पल भर में ये वक़्त, और हसीन सफ़र हो जाये. - Piyush Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 4678553
Posted: Jul 31 2020 (10:53)

5 Responses
Last Response: Aug 03 2020 (08:20)
Info Update
195505 views
9

Jul 31 2020 (10:53)   11139/Mumbai CSMT - Hosapete SF Express (PT) | BJP/Vijayapura (Bijapur) (3 PFs)
hussain
hussain   60 blog posts
Entry# 4678553            Tags   Past Edits
DOUBLING BETWEEN LACHYAN-HOTGI (33 KM) COMMISSIONED

Commissioner of Railway safety has inspected Lachyan-Hotgi (33 km) section on 18th May and section was commissioned by South Western Railway on 29th July along with remodeling of Hotgi yard by Central Railway even in difficult situation of covid pandemic. Two halt stations (Padnur, Sulerjavalge) and one block station (Tadwal) are situated under this section.
...
more...

The track passes through the 670 m long important bridge over River Bhima, the longest bridge in the zone comprising 14 spans of 45.7 m spans is a major achievement. This bridge is designed to fit for 25T axle loading. Currently, speed restrictions are imposed on existing bridge since it is not capable of carrying higher axle loads.

The bridge consists of two lines, first line is ready for traffic movement & second line will be ready by October. New bridge will increase speed of goods trains and throughput. As on date 148 Km of track from Wandal - Hotgi is commissioned & entire 284 Km section from Hotgi to Gadag will be completed to double line by 2020

Translate to English
Translate to Hindi

83126 views
0

Jul 31 2020 (14:00)
hizmzm^~
hizmzm^~   2944 blog posts
Re# 4678553-1              
Bridge is 3 lane?
Translate to English
Translate to Hindi

79093 views
0

Jul 31 2020 (14:10)
Ayushman198~
Ayushman198~   1056 blog posts
Re# 4678553-2              
yes
Translate to English
Translate to Hindi

79219 views
2

Jul 31 2020 (20:12)
hussain
hussain   60 blog posts
Re# 4678553-3              
Yes, only one new line will be used, 2nd line yet under progress, till old line will be used, after completion of 2nd line, old line will be use for ward or may be demolished
Translate to English
Translate to Hindi

79512 views
0

Jul 31 2020 (20:14)
Ayushman198~
Ayushman198~   1056 blog posts
Re# 4678553-4              
thanks
Translate to English
Translate to Hindi

82783 views
1

Aug 03 2020 (08:20)
Irshad13~
Irshad13~   8102 blog posts
Re# 4678553-5               Past Edits
The project was to build entire double line new bridge as u can see old one which is on left side in pic is very old and can't able to withstand high density freight traffic also speed restrictions were on at this old bridge. Now one lane is ready and still trains using old bridge and one lane new bridge. Hope by October another new lane will be ready to traffic were then old will be abandoned..
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy