Search Forum
Blog Entry# 4718120
Posted: Sep 17 2020 (09:54)
No Responses Yet
No Responses Yet
The schedule of these clone trains give a very good idea what IR wishes to do with ZBTT, atleast in all high priority trains of a particular route.
Giving example of BSK clone after SPJ RR, MFP 5m halt,CPR 5m halt,GKP 10m halt(instead of 15m), ASH 5m halt (instead of 10m) and CNB 5m halt.
The halts have been reduced to minimum possible halts and similarly halt duration has been reduced to minimum possible duration.
Also...
more...
Giving example of BSK clone after SPJ RR, MFP 5m halt,CPR 5m halt,GKP 10m halt(instead of 15m), ASH 5m halt (instead of 10m) and CNB 5m halt.
The halts have been reduced to minimum possible halts and similarly halt duration has been reduced to minimum possible duration.
Also...
more...