Garladinne to Taticherla doubling completed yesterday with 110Kmph approved speed by CRS inspection team
2 Posts
are they completed inspection including electrification or only doubling
I have updated Garladinne - Taticherla section as double electric line. This change will reflect in map view of atlas after few days
Inspection rake had both diesel and electric locos. So inspection would have been done including electrification because single line was electrified long ago
When the existing track is electrified, the double line need to be electric, it cannot be opened without electrification