💥CRS Inspection of Doubling between Kulali-Savalgi(27Km) and CRS inspection of Railway Electrification between Tajsultanpur -Savalgi(25km) on 11th November 2020
💥 CRS Inspection of Railway electrification between Bhigwan-Kurduwadi(81km) on 12th November 2020
💥 CRS Inspection of Railway electrification between Bhigwan-Kurduwadi(81km) on 12th November 2020
13 Posts
What about MIRAJ kurduwadi electrification?
Work completed long ago...
Engine trials done se real times...
Why CRS is pending...?
Work completed long ago...
Engine trials done se real times...
Why CRS is pending...?
Sir, but the massive backwaters of Bhima river poses a big hurdle in doubling.
But anyways, let us hope for the best.
But anyways, let us hope for the best.