Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Purvanchal Express - Poorvottar ka Sikandar

Search Forum
<<prev entry    next entry>>
Blog Entry# 4842749
Posted: Jan 13 2021 (04:26)

6 Responses
Last Response: Jan 25 2021 (11:08)
Timeline
7722 views
1


TheMadrasMail~
Jan 13 2021 (04:26)
Jan 13 2021 (04:26)   Punjab Mail (PT)/12137   Train - Train Name/Number
CircarExpress
TheMadrasMail~   237 Conf TLs   0 Void TLs
Number: 12137
Train Name: Punjab Mail
Regional Name: पंजाब मेल
Hindi Name: पंजाब मेल
Inaugural Run: 1905-03-14

Jun 13 2020 (09:26)   (previous value)
Timeline Entry# 3455527
by: ELSG^~
Number: 12137
Train Name: Punjab Mail
Regional Name: पंजाब मेल
Hindi Name: पंजाब मेल
Inaugural Run: 1912-06-01

1 Public Posts - Wed Jan 13, 2021

3 Public Posts - Mon Jan 25, 2021

8798 views
0

Jan 25 2021 (09:21)
Tej Kumar Yadav~   10150 blog posts
Re# 4842749-5              
Punjab Mail
The Punjab Mail runs between Bombay and Firozpur. This was the GIPR train; there was another train of the same name that ran for a while between Calcutta and Delhi on the East Indian Railway. The Punjab Mail made its debut on 1st June 1912. Like the later Frontier Mail, the Punjab Mail too used to connect with the P&O steamships on fixed mail days and would steam off from the Mole Station; on other days it departed from Bombay's Victoria Terminus.

For
...
more...
a brief period, an extended service called The Punjab Limited operated between Bombay VT and Peshawar, on the GIPR and NWR; this was a rival to the Frontier Mail, but does not seem to have lasted as a service for long. (There is some doubt whether the Punjab Limited was an entirely separate special service or a special extension of the Punjab Mail.) The Punjab Mail was among the fastest trains in pre-Independence India (probably the fastest one at various times). The train had air-cooled cars in 1945.

It was hauled by a variety of locos. XC locos were used after the rake was extended by the addition of third-class cars in the 1930s. In 1929-1930 EA/1 electric locos were used experimentally. The train later ran electric-hauled until Manmad, where a WP took over. From 1968 the train was diesel-hauled until Jhansi and by 1976 or so it became diesel-hauled all the way. A WCAM-1 loco was used a few times in an attempt to provide continuous haulage without locomotive changes, in the 1970s. Since then, and continuing today, it is hauled by a DC locomotive until Igatpuri and an AC locomotive thereafter towards Delhi and Firozpur.
click here

Translate to English
Translate to Hindi

1 Public Posts - Mon Jan 25, 2021
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy