Search Forum
Blog Entry# 4934165
Posted: Apr 09 2021 (18:14)
2 Responses
Last Response: Apr 10 2021 (02:37)
2 Responses
Last Response: Apr 10 2021 (02:37)
Dharmavaram- chigicherla doubling update: totally it is a mixed work. No much work upto 1 km from Dharmavaram. Two major bridge works going in. The works started. Ballast is spread from chigicherla side to the bridge. Electric poles are elected upto bridge. Rails are placed along the tracks, in some places sleepers are kept side of the track
there was some bridge construction happening at DMM outer, was it over?