रेलमार्गों के विद्युतीकरण के लिये 700 करोड़ रुपये के 2 अलग-अलग टेंडर किये जारी, दिसंबर 2023 तक विद्युतीकरण कार्य पूरा करने का लक्ष्य।।।
15 Posts
No...the only main reason for not operating elocos on already electrified route is the Traction Sub Station. If TSS is made on time, then power supply will be there for elocos, otherwise not.
Whether BGKT TSS will be able to take care of full route from MJ till FL via JU? Or another TSS is under construction on JU - FL route to take the load
TSS is made in every 80 kms distance from each other.
2 are currently under construction on merta kuchaman route and more will be made after doubling completes in merta rkb section.
2 are currently under construction on merta kuchaman route and more will be made after doubling completes in merta rkb section.
in upcoming year Bilara will be on main line
It will connect both ajmer udaipur Indore
आज दिल्ली में माननीय केंद्रीय रेल मंत्री श्री अश्विनी वैष्णव जी से भेंट कर संसदीय क्षेत्र के रेल संबंधित मुद्दों पर सार्थक चर्चा की।
...
more...
It will connect both ajmer udaipur Indore
आज दिल्ली में माननीय केंद्रीय रेल मंत्री श्री अश्विनी वैष्णव जी से भेंट कर संसदीय क्षेत्र के रेल संबंधित मुद्दों पर सार्थक चर्चा की।
...
more...
No new announcement on bilara-bar missing link project till now?