Search Forum
Blog Entry# 4949986
Posted: Apr 29 2021 (11:25)
10 Responses
Last Response: May 14 2021 (02:15)
10 Responses
Last Response: May 14 2021 (02:15)
Is there is any guide line Loco change location. Loco shed to be required for either or any side of LC.
Currently LC is carried out at ADI for Rajasthan or north bound train. Same can be possible at Abu Road but LC is carried out at ADI. Why at ADI???
Currently LC is carried out at ADI for Rajasthan or north bound train. Same can be possible at Abu Road but LC is carried out at ADI. Why at ADI???
8 Public Posts - Thu Apr 29, 2021
Managing loco changes requires a fair amount of infrastructure.
1| Crew lobby - If the station is handling a lot of loco changes, then adequate facilities will be required for the crew (LPs, ALPs etc).
2| Parking lines for locomotives - Dock sidings or parking lines will be required for the locos
3| Trip shed - Depending on the number of LCs being...
more...
1| Crew lobby - If the station is handling a lot of loco changes, then adequate facilities will be required for the crew (LPs, ALPs etc).
2| Parking lines for locomotives - Dock sidings or parking lines will be required for the locos
3| Trip shed - Depending on the number of LCs being...
more...
1 Public Posts - Fri May 14, 2021