Search Forum
Blog Entry# 5054770
Posted: Aug 30 2021 (22:56)
8 Responses
Last Response: Sep 01 2021 (18:00)
8 Responses
Last Response: Sep 01 2021 (18:00)
Other News
MCPNBR~ 1437 news posts
New Delhi: The Indian Railways has floated a tender for 58 rakes of the new Vande Bharat Express trains. Earlier this year, the Railways had filed...
IRCTC Latest News: Railways Targets to Deliver 102 New Vande Bharat Trains by 2024
IRCTC Latest News: Railways Targets to Deliver 102 New Vande Bharat Trains by 2024
3 Posts
This is jumla only.
Actual safety measures have been far less and fewer.
Actual safety measures have been far less and fewer.
The project has been suspended as per inside info from a very senior officer.. part of T18 making group in ICF chennai..
.
Due to length issues in train sets sleeper berth.was no possible as per standard ..
As that of in LHB ..
Hence...
more...
.
Due to length issues in train sets sleeper berth.was no possible as per standard ..
As that of in LHB ..
Hence...
more...
though, replacement of T-18 rakes into shatabdi wud b in public interest.
but
lets look d other side as well i.e financial/economic/business aspect
JAT Raj covers d distance in 8:20 hr whereas VB covers d same distance in 6:38hr.
....
more...
but
lets look d other side as well i.e financial/economic/business aspect
JAT Raj covers d distance in 8:20 hr whereas VB covers d same distance in 6:38hr.
....
more...
I guess all shatabdi will be replaced with VBE
But after with introduction of new connectivity
But after with introduction of new connectivity
dere might not b 75 new connectivity(ies) possible for super premium AC trains.
.
d one were not done earlier due to distance can be considered though like
existing NDLS-BSB, NDLS-SVDK
prospects CSMT...
more...
.
d one were not done earlier due to distance can be considered though like
existing NDLS-BSB, NDLS-SVDK
prospects CSMT...
more...