Search Forum
Blog Entry# 5110392
Posted: Nov 02 2021 (14:09)
8 Responses
Last Response: Nov 08 2021 (20:58)
8 Responses
Last Response: Nov 08 2021 (20:58)
Nov 02 2021 (14:09) Tulsi Special (PT)/02130X Train - Rake/Coach Composition
Bundelkhand Expressway The Game Changer
SPSingh^~ 1363 Conf TLs 30 Void TLsLHB Rake; LOCO-EOG-A1-B1-B2-B3-B4-S1-S2-S3-S4-S5-S6-S7-S8-S9-S10-S11-S12-D1-D2-D3-EOG
LHB Rake; LOCO-EOG-D3-D2-A1-B4-B3-B2-B1-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-D1-EOG
15 Posts
The exact sequence of coaches may be different. Cc update should not be done on the basis of sequnece seen in IRCTC chart
May update using the edit option whenever sure about cc,, till then Let it stay in fixit.
May update using the edit option whenever sure about cc,, till then Let it stay in fixit.