Search Forum
Blog Entry# 5167175
Posted: Dec 19 2021 (22:49)
10 Responses
Last Response: Dec 20 2021 (18:27)
10 Responses
Last Response: Dec 20 2021 (18:27)
Dec 19 2021 (22:49) 17603-Slip2/Kacheguda - Vasco Da Gama Express Slip | KRNT/Kurnool City (3 PFs)
Rendezvous
Rendezvous 313 blog postsWhen are we going to get a separate train from Kacheguda - Madgaon?
Railways is slowly removing the process of slip trains right??
This train wastes almost 60 to 90 minutes at Guntakal Junction Railway Station.
Even Hyderabad deserves a daily service train to Goa in short span of time.
Railways is slowly removing the process of slip trains right??
This train wastes almost 60 to 90 minutes at Guntakal Junction Railway Station.
Even Hyderabad deserves a daily service train to Goa in short span of time.
2 Public Posts - Sun Dec 19, 2021
7 Public Posts - Mon Dec 20, 2021
Double line extends till Tinaighat infact. Besides SVM to Majorda also double line in Goa. SWR will not allow a train untill there is a political pressure eg. VSG HYB/TPTY, VSG JSME, VSB BGM biweekly passenger (discontinued) or there is some benefit to Karnataka ie. VSG YPR frequency increase from biweekly to daily (serves alternative ICE to Siddhaganga SF).
This also obstructs LHBfying of HWH VSG which was proposed by SER I think (fellow Goan RF told me) but cancelled bcoz slip cancellation was rejected.
This also obstructs LHBfying of HWH VSG which was proposed by SER I think (fellow Goan RF told me) but cancelled bcoz slip cancellation was rejected.