Search Forum
Blog Entry# 5213046
Posted: Feb 09 2022 (13:48)
7 Responses
Last Response: Feb 10 2022 (03:25)
7 Responses
Last Response: Feb 10 2022 (03:25)
SRC WAP7 37177 with RE CRS inspection between Bhanjpur and Bangriposi,
SER will be 100% electrified zone of IR 😍😍
SER will be 100% electrified zone of IR 😍😍
4 Posts
SER is 3rd after WCR and ECoR. If Kolkata Metro is considered, then SER becomes 4th