Feb 10 2022 (07:54) BEHS/Bihar Sharif Junction (5 PFs)
RohitBiharSharif~
RohitBiharSharif~ 7353 blog posts• Works to be done for commissioning of Bihar Sharif Jn - Barbigha section of Bihar Sharif - Sheikhpura under-construction line.
• Loops of all three proposed crossing stations - Noorsarai, Chandi and Lachchhu bigha on Bihar sharif - Daniyawan line to be made operational by the end of March, 2022.
• Loops of all three proposed crossing stations - Noorsarai, Chandi and Lachchhu bigha on Bihar sharif - Daniyawan line to be made operational by the end of March, 2022.
1 Public Posts - Fri Feb 11, 2022
Hum ummeed nhi rakhte waise bhi. 10 saal aur lagega railways se...