Anand godhra #doubling status
BOQ tenders are being planned due to land unavailability in continuous stretch. The tender is being planned for utility shifting. Verification of L-section is in progress. Minor land acquisition will be required for easing of curves, shifting of LC etc. commissioning of project will not be delayed as these works will be taken up in phase-II. TDC: Phase-I:- Anand-Dakor(29.62Kms)-June-2024. Phase-II:-Dakor-Godhra(49.18Kms)-Dec.2024. Revised cost involving Material Modification at a gross cost Rs 742.88 crore sent to Railway Board on 03.12.2021.
BOQ tenders are being planned due to land unavailability in continuous stretch. The tender is being planned for utility shifting. Verification of L-section is in progress. Minor land acquisition will be required for easing of curves, shifting of LC etc. commissioning of project will not be delayed as these works will be taken up in phase-II. TDC: Phase-I:- Anand-Dakor(29.62Kms)-June-2024. Phase-II:-Dakor-Godhra(49.18Kms)-Dec.2024. Revised cost involving Material Modification at a gross cost Rs 742.88 crore sent to Railway Board on 03.12.2021.