Search Forum
Blog Entry# 5222309
Posted: Feb 19 2022 (10:56)
5 Responses
Last Response: Feb 20 2022 (05:23)
5 Responses
Last Response: Feb 20 2022 (05:23)
ECR/East Central
Rajdhani_in_KG_line~ 174 news posts
The Railway Ministry has recently written a letter to East Central Railway.
In...
Varanasi-Howrah bullet train will pass through Sasaram-Gaya in Bihar
In...
Varanasi-Howrah bullet train will pass through Sasaram-Gaya in Bihar
So most probably SSM, GAYA, PNME, DHN , DGR will be HSR stations.
BSB - 120.2 SSM, 223.0 Gaya - 375.0 PNME - 422.7 DHN - 481.0 ASN - 523.1 DGR - 586.5 BWN - 681.0 HWH. Timings as example:-
BSB 06.30; SSM 07.42/44; Gaya 08.35/37; PNME 10.00/02; DHN 10.29/31; ASN 11.02/04; DGR 11.25/27; BWN 12.02/04; HWH 13.05| 681 kms in 6 hrs 35 mins @ 103.3 kph | HWH 14.40; BSB 21.15 |
BSB 06.30; SSM 07.42/44; Gaya 08.35/37; PNME 10.00/02; DHN 10.29/31; ASN 11.02/04; DGR 11.25/27; BWN 12.02/04; HWH 13.05| 681 kms in 6 hrs 35 mins @ 103.3 kph | HWH 14.40; BSB 21.15 |
Yeh speed toh semi high speed ka hua, Avg 200 kmph and max 300-320 kmph hona tha.
Average 200 kph is only possible in Rajasthan, Gujarat, U.P & M.P.
This will be on new elevated tracks and not on existing ones. Average speed will have to be higher as train is going to do 3-4 trips per day to be profitable. Anyway these are just pipe dream now. Not before 2035-2040 surely.