Search Forum
Blog Entry# 5244570
Posted: Mar 16 2022 (15:56)
2 Responses
Last Response: Mar 16 2022 (17:45)
2 Responses
Last Response: Mar 16 2022 (17:45)
Mar 16 2022 (15:56) BAY/Ballari Junction (Bellary) (4 PFs)
JaiVidarbha^~
JaiVidarbha^~ 2183 blog postsShri Sanjeev Kishore, General Manager, South Western Railway, conducted statutory annual inspection on Ballari-Gadag Section over Hubballi Division 14.03.2022.
A speed trial was conducted between Ballari and Daroji station clocking a speed of 110 kmph. This is a testimony to the good maintenance of track, signaling and other parameters.
A speed trial was conducted between Ballari and Daroji station clocking a speed of 110 kmph. This is a testimony to the good maintenance of track, signaling and other parameters.
why can't the appprove pitlines at ballari and extend few trains from UBL
So does this mean that we can expect trains to run at 110 MPS in BAY UBL section.