Search Forum
Blog Entry# 5244622
Posted: Mar 16 2022 (17:16)
9 Responses
Last Response: Mar 19 2022 (13:29)
9 Responses
Last Response: Mar 19 2022 (13:29)
IR Affairs
ER/Eastern
AdittyaaSharma^~ 68859 news posts
Indian Railways News रेलवे ने नये डिजाइन की वंदे भारत एक्सप्रेस को भी पटरी पर उतारने की घोषणा की है। हावड़ा से रांची और हावड़ा से...
4 Posts
HWH-BSB VB should have avg speed of about 90KMPH as HWD-DDU Raj is averaging 84kmph and VB avg speed should be higher than that
Not possible until tracks are upgraded. Max speed is still the same.
Possible hai 90+ Average...
In 130 MPS ....BSB VB taking 6:08 Hrs (NDLS-PRYJ) while Rajdhani taken 6:53 Hrs. Hence MPS will be Higher than Rajdhani.
In 130 MPS ....BSB VB taking 6:08 Hrs (NDLS-PRYJ) while Rajdhani taken 6:53 Hrs. Hence MPS will be Higher than Rajdhani.
**NDLS-BSB VB & Rajdhanis operating on NDLS-PRYJ has same max speed, the avg speed of VB train set is 103kmph against 92/93 kmph of Rajdhani
**VB is faster due to its faster acceleration & deceleration.
**VB is faster due to its faster acceleration & deceleration.