Search Forum
Blog Entry# 5421446
Posted: Jul 22 2022 (15:50)
No Responses Yet
No Responses Yet
#NHSRCL invites bids for the design and construction of Bandra Kurla Complex (BKC) #HSR station in Mumbai, which includes a cut and cover tunnel length of 467m and a ventilation shaft of 66 m (MAHSR C1 Package). click here