Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Poorabiya Express: कोसी की शान से दिल्ली महान तक - Md Rashid Alam

Search Forum
<<prev entry    next entry>>
Blog Entry# 5451619
Posted: Aug 16 2022 (22:28)

3 Responses
Last Response: Aug 29 2022 (16:07)
General Travel
17212 views
2

Aug 16 2022 (22:28)   ADTP/Adityapur (3 PFs)
Rail12345
Rail12345   2331 blog posts
Entry# 5451619            Tags   Past Edits
LOTS OF TENDER WORKS FOR SER:
Consultancy services for detailed project report and detailed design consultancy in connection with execution of work for preliminary works such as final location survey, soil investigation works, preparation yard plans, slope stability analysis and submission of various detailed design & drawings between
(i) dangaoposi-jaroli 3rd line (44.10 km),
(ii) gamaharia-chandil 3rd line (25.50 km),
(iii)
...
more...
aditypur-rajkharswan 4th line (37 km),
(iv) barbendra-damrughutu doubling,
(v) rajkharswan-dangaoposi 4th line (75 km),
(vi) gamaharia-chandil 4th line (25.50 km),
(vii) sini-kandra 3rd line & 4th line (27.2 km) &
(viii) dangoaposi-jaroli 4th line (44.90 km)
(ix) damrughutu-bokaro steel city 3rd line ),
(x) nimpura reception yard-kharagpur 3rd line (4.40 km),
(xi) hijli-nimpura 3rd line (5 km),
(xii) nimpura reception yard-kharagpur 4th line (4.00 km),
(xiii) kharagpur-tatanagar 4th line (134.1 km) &
(xiv) kalaikunda-nimpura west outer-gokulpur connectivity avoiding nimpura reception yard (5 km)
(xv) tatanagar-rourkela 4th line (163.4 km)
(xvi) 3rd line between panskura & tamluk junction cabin (24 km)
(xvii) 4th line between santragachi and kharagpur (109 km
(xviii) anara-rukani doubling (8.25 km),
(xixi) adra-sank-rukani doubling (16 km) &
(xx) bokaro-bokaro (n) cabin 3rd line & 4th line (6 km) under the jurisdiction of dy ce/con/ii/ranchi and
(i) barsuan-bimalgarh doubling (21 km)
(ii) bondamunda-bimalgarh 3rd line (41 km)

Translate to English
Translate to Hindi

1 Public Posts - Wed Aug 17, 2022

5557 views
0

Aug 21 2022 (21:44)
surjitbasu~
surjitbasu~   1383 blog posts
Re# 5451619-2               Past Edits
That's fine... But why two different tenders for ADTP-RKSN 4th and TATA-ROU 4th lines..!!
And how long it usually takes to start these works on ground after the survey??
Translate to English
Translate to Hindi

1 Public Posts - Mon Aug 29, 2022
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy