Search Forum
Blog Entry# 5451619
Posted: Aug 16 2022 (22:28)
3 Responses
Last Response: Aug 29 2022 (16:07)
3 Responses
Last Response: Aug 29 2022 (16:07)
LOTS OF TENDER WORKS FOR SER:
Consultancy services for detailed project report and detailed design consultancy in connection with execution of work for preliminary works such as final location survey, soil investigation works, preparation yard plans, slope stability analysis and submission of various detailed design & drawings between
(i) dangaoposi-jaroli 3rd line (44.10 km),
(ii) gamaharia-chandil 3rd line (25.50 km),
(iii)...
more...
Consultancy services for detailed project report and detailed design consultancy in connection with execution of work for preliminary works such as final location survey, soil investigation works, preparation yard plans, slope stability analysis and submission of various detailed design & drawings between
(i) dangaoposi-jaroli 3rd line (44.10 km),
(ii) gamaharia-chandil 3rd line (25.50 km),
(iii)...
more...
1 Public Posts - Wed Aug 17, 2022
That's fine... But why two different tenders for ADTP-RKSN 4th and TATA-ROU 4th lines..!!
And how long it usually takes to start these works on ground after the survey??
And how long it usually takes to start these works on ground after the survey??
1 Public Posts - Mon Aug 29, 2022