Search Forum
Blog Entry# 5463720
Posted: Aug 30 2022 (17:13)
40 Responses
Last Response: Sep 23 2022 (00:13)
40 Responses
Last Response: Sep 23 2022 (00:13)
37 Posts
Kumbha runs 5 days and Upasana 2 days a week. Both originate from DDN now on permanent basis. The proposal mentions Kumbh to be running 4 days from HW. Unable to understand the quality of this proposal
I think the route of 15073/74/75/76 Triveni Express could have been changed if there was not loco reversal scenario at Pilibhit jn which takes about 25-35 mins. This train is important for people of Bareilly and I don't think it's route would be changed. Also travel time btw Tpu-spn via Be is 4 hr 6 min and Tpu-Spn via pbe-bsur would be 3 hr 40 mins. So that would be the difference of 25 mins and without loco reversal the time difference would have been of 45 mins. Let's see what happens next.
सही कहा आपने। नरवाना में वर्ष 2000 से पहले washing line होती थी, 2 गाड़ियों के लिए काफी थी। अपने काम को कम करने के लिए बंद कर दी
Even scr and swr are not interested in connecting northern party's which are unconnected like amritsar,rishikesh jammu
route changes of many train. Bagh will get new TT:- HWH 23.00; LKO 20.30/45; BE 00.50/55; LKU 02.35/45; HDW 03.03/05; KGM 03.30| KGM 23.15; BE 01.50/55; LKO 05.50/06.05; HWH 03.45