Search Forum
Blog Entry# 5542658
Posted: Nov 12 2022 (08:24)
4 Responses
Last Response: Nov 16 2022 (08:31)
4 Responses
Last Response: Nov 16 2022 (08:31)
Commentary/Human Interest
SWR/South Western
karbang~ 1745 news posts
With the opening of the Sir M Visvesvaraya Terminal in Baiyappanahalli, traffic congestion has been a never-ending problem for the residents in the vicinity of the...
read more... Terminal stillness
2 Public Posts - Mon Nov 14, 2022
It should be possible to take one overhead line connecting bypass line to SMVB.
If not, railways should try to give a link at Lottegollahalli. Here definitely a link line overhead type passing over the ORR flyover is possible.
If not, railways should try to give a link at Lottegollahalli. Here definitely a link line overhead type passing over the ORR flyover is possible.
1 Public Posts - Wed Nov 16, 2022