Can anyone throw some info on underlined part on how Ground level reservoir is helpful?
Had been to Nellore railway station last week... Here are few observations on Redevelopment work..
1)East...
more...
Had been to Nellore railway station last week... Here are few observations on Redevelopment work..
1)East...
more...
regarding the ground reservoir I have no clue
1) Only East side (PF-4) entrance is being developed not the west side (PF-1) entrance.
2)there used to be a waiting hall at almost every pf in NLR, but now they have dismantled and they are going to construct a new waiting hall near the GDR end of PF-2&3
3)...
more...
1) Only East side (PF-4) entrance is being developed not the west side (PF-1) entrance.
2)there used to be a waiting hall at almost every pf in NLR, but now they have dismantled and they are going to construct a new waiting hall near the GDR end of PF-2&3
3)...
more...
West side Sbi ATM, reservation booking office undevi kadha.. avi dismantle chesaru
Pf2/3 Gdr end lo temporary waiting hall setup chesaru.. once construction is done, tesivestaru emoo..
Pf2/3 Gdr end lo temporary waiting hall setup chesaru.. once construction is done, tesivestaru emoo..
Ground level reservoir is nothing but a water storage structure. Water storage tanks will be used as over head tanks. But now this reservoir can be used to store both motor water and rain water. Can be used in summer or some other seasons when water storage is required. Can also be used for watering the trains if watering facility is available. If provision of municipal water is available, the same can be stored in regular basis. No more water shortage