Statutory Inspection of RE works followed by speed trial at full sectional speed (110 Kmph) in Jagraon- Moga-Firozpur (83RKM/103TKM) single line section of FZR Div. of NR completed. With this, CORE achieves 3993.391RKM/5588.01TKM in (22-23).
2 Posts
March mahine aate hi Railway Electrification ka Diwali jaisa lagne lagta hain... Charo aur sirf Electrification ka patake force lagte hain💥💥💥
I don’t think Yard is included. Lastly seen a lot of work was pending.
If this would completed than 12137/38 would run fully with electric loco and halt at bti is also gonaa reduce from 25 to 5-10 minutes