Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Vaishali Express - जितना सुंदर तुम्हारा नाम उतनी सुंदर तुम्हारी चाल - be my valentine - Rahul Vatsa

Search Forum
<<prev entry    next entry>>
Blog Entry# 5695322
Posted: Apr 15 2023 (16:39)

21 Responses
Last Response: Apr 24 2023 (11:12)
Travel Question
62321 views
2

Apr 15 2023 (16:39)   TVC/Thiruvananthapuram Central (Trivandrum) (5 PFs)
Ash~
Ash~   773 blog posts
Entry# 5695322            Tags  
1 compliments
Agree
Is there a chance for starting 2 Vande Bharath trains in Kerala?

Trivandrum - Kannur seems to be the first one and what about the 2nd one..... It would be nice if there is a Trivandrum - Palakkad/Coimbatore Vande Bharath
Translate to English
Translate to Hindi

17 Posts

25774 views
0

Apr 19 2023 (22:24)
irifan2015~
irifan2015~   2495 blog posts
Re# 5695322-18               Past Edits
CLT SBC dedicated SR train is needed. What is the point in extending Kannur train which will reach CLT by 1100 or 1200? Same way will have to leave CLT before 1600.

Why not a CLT SMVB via SRR CBE SA HSRA starting at CLT 1900 CBE 2300 SA 0145 SMVB 0630? SMVB 2130 SA 0145 CBE 0430 CLT 0800 would be a super hit.
Why
...
more...
no action by SR PGT?

During day time, it can make a trip to SA. Something like SMVB 0800 SA 1230; SA 1500 SMVB 1930. Go back to CLT as ONT.

Translate to English
Translate to Hindi

23840 views
0

Apr 20 2023 (12:52)
RFIR~
RFIR~   6956 blog posts
Re# 5695322-19              
Yes SR can start trains. If I recollect correctly there was a proposal by TPJ division for a train to SBC ( using one remaining day slot of 12683 group of trains)...probably Tuesday from TPJ. I think it was approved in the IRTTM but after that no news. Similarly many proposals were rejected /put on hold by SWR with a note mentioning 'Will be considered once new terminal is ready at BYPL. Now with the new terminal opened, I think they need to again revive the discussion again. Pre-covid there was lot of visibility however post covid not much info.
Translate to English
Translate to Hindi

23317 views
0

Apr 20 2023 (12:57)
RFIR~
RFIR~   6956 blog posts
Re# 5695322-20              
Ideally in a trial run, full route needs to be clear so that the authorities can clock in the correct running time and then understand other finer aspects. In this case as per reports, controller thought that trail run doesnt have any passengers whereas Venad Express ( which is typically a commuter train has lot of passengers) was given precedence. VB had to halt because of this. He was suspended but suspension was revoked when unions intervened. Before trial run is done, I think all controllers are ideally informed not to halt the train having trial run midway. Dont know what and how this happened.
Translate to English
Translate to Hindi

21867 views
0

Apr 20 2023 (14:08)
krnt_vskp_express~
krnt_vskp_express~   5733 blog posts
Re# 5695322-21              
I still feel suspension is too much.
Translate to English
Translate to Hindi

14420 views
0

Apr 24 2023 (11:12)
irifan2015~
irifan2015~   2495 blog posts
Re# 5695322-22              
SR can have a train something like MAQ HAS SMVB/SMVB TPJ ONT in MAQ SMVB MAQ and daytime in SMVB TPJ SMVB.
Start from MAQ 2000 SBHR 2215 SMVB 0515 SA 0900 TPJ 1130. TPJ DEP 1530 SA 1800 SMVB 2230 SBHR 0500 MAQ 0730.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy