Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

For a RailFan, watching MPS skips are far more interesting than watching F1 race - Prince Maan

Search Forum
<<prev entry    next entry>>
Blog Entry# 5717009
Posted: May 08 2023 (19:02)

15 Responses
Last Response: May 10 2023 (10:53)
General Travel
84476 views
15

★★
May 08 2023 (19:02)   04706/Jaipur - Shri Ganganagar Special Fare Special
Prometheus^~
Prometheus^~   15213 blog posts
Entry# 5717009            Tags   Past Edits
9 compliments
Useful Useful Useful Useful Useful Great Great Great Useful
Extension Approved
JP LHU to BTI
JP SDLP to SGNR
Translate to English
Translate to Hindi

10 Posts

36438 views
1

May 09 2023 (07:21)
deepak.yerr~
deepak.yerr~   6203 blog posts
Re# 5717009-11              
1 compliments
Useful
The extention of JP SC to Kurnool is purely with SCR as already Railway board has approved. SCR might have forwarded the proposal with consent of JP to Rly board As the rake is fom JP and has route length of 1700km and doesn't need SM at SC and only stabling SCR wantes to extend 243km making 1950km one way and 3900km round trip which is the maximum limit for PM of LHB rake. The issue here is after extention 2 PF out of 3 will be occupied by 2 trains for couple of hours and both up and down train must be accommodated in one PF which is a operational constraint. So SCR might have rethought and changed terminal to KCG so that it is stabled some 30-50km
...
more...
down station for time being.

Translate to English
Translate to Hindi

38889 views
1

May 09 2023 (18:30)
Prometheus^~
Prometheus^~   15213 blog posts
Re# 5717009-12              
NWR Official PR
Translate to English
Translate to Hindi

33672 views
0

May 09 2023 (23:56)
krnt_vskp_express~
krnt_vskp_express~   5707 blog posts
Re# 5717009-13              
they can very well use 2 stabling lines to park this train
Translate to English
Translate to Hindi

30970 views
0

May 10 2023 (10:25)
deepak.yerr~
deepak.yerr~   6203 blog posts
Re# 5717009-14              
KCG 715 extended portion it will arrive at 1145 and have to leave at 1700. The stabling lines should have watering facility. Being long distance train washrooms have to be cleaned which is done by use of hipressure water jet pump mounted on trolley which can be done only on PF. I don't know whether this jet pump is available at Kurnool though 3 trains are terminating and all are short distance. Taking to stabling line for 2.5hrs and bringing back at 1500 to PF for cleaning is a big task. May be SCr is waiting for new TT in which most trains will get speedup and change in timings to accomodate all extentions granted in Jan 2023. Even Uday can be extended to Guntur but there will be change in operational staff from Vja to GNT so not yet done. Same with Vskp KCG
Translate to English
Translate to Hindi

30218 views
0

May 10 2023 (10:53)
krnt_vskp_express~
krnt_vskp_express~   5707 blog posts
Re# 5717009-15              
I don't see high speed waterpumps in Kurnool , your assumption makes sense about new TT
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy