Search Forum
Blog Entry# 5732402
Posted: May 24 2023 (11:54)
7 Responses
Last Response: May 31 2023 (11:59)
7 Responses
Last Response: May 31 2023 (11:59)
New Facilities/Technology
SWR/South Western
sachinature~ 1664 news posts
South Western Railway has made focused efforts to improve the mobility of trains through various measures to achieve the highest performance among all railway zones in...
2 Posts
12780 Goa express never reaches VSG on time always gets delayed post LD.
All on paper only.
Terminate GG at BJP.
Run Basava via GTL BAY GDG till SUR.
Run BJP YPR via GDG HPT DVG.
These 3 trains should be arranged in such a way...
more...
Terminate GG at BJP.
Run Basava via GTL BAY GDG till SUR.
Run BJP YPR via GDG HPT DVG.
These 3 trains should be arranged in such a way...
more...
And to compensate GG terminating at BJP, Mangaluru - Bjp Exp can be extended to Solapur/Klbg/Bidar.
To compensate for KLBG due to Basava rerouting, one new SCR train BIDR MYS Via KLBG RC GTL DMM SBC to be introduced
Soon Bidar - Smvb will be introduced this is high in demand already.