Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Gatimaan Express: Raftaar meri Pehchaan - Sajid Akhtar

Search Forum
<<prev entry    next entry>>
Blog Entry# 5775370
Posted: Jul 13 2023 (15:07)

30 Responses
Last Response: Mar 22 (14:46)
General Travel
70266 views
7

Jul 13 2023 (15:07)   17311/MGR Chennai Central - SSS Hubballi SF Express (PT) | VSG/Vasco-da-Gama (3 PFs)
sunilgaonkar
sunilgaonkar   92 blog posts
Entry# 5775370            Tags   Past Edits
1 compliments
Agree
The train should be extended To Vasco via RU, GTL, BAY, UBL as the 2nd pit line is commenced at VSG. Since this train does not have much patronage on the existing route due to daily 17309/10 VSG - YPR Express. Also it is the only train connecting Goa to hinterlands of AP.
Translate to English
Translate to Hindi

28 Posts

14006 views
0

Mar 20 (18:54)
LHB_for_18047~
LHB_for_18047~   10641 blog posts
Re# 5775370-29              
Even then trains are not able to maintain that schedule. Always getting delayed.
Translate to English
Translate to Hindi

14383 views
3

Mar 20 (19:02)
LHB_for_18047~
LHB_for_18047~   10641 blog posts
Re# 5775370-30              
Yes that should be done but since it's Vasco SWR won't care. Here focus is only to increase freight traffic this is one of the reason why locals oppose track doubling because even for a single line section passenger traffic is too low. The so called 2nd pitline at Vasco is in construction since 2019 but SWR not even bother to commission it yet.
Even the old pitline can accomodate max 20 LHB trains they don't even bother to increase its length for 22 LHB coaches. Trains like Goa express, Vasco Patna SF, Vasco Jasidih exp would have run with 22 coach LHB rakes if they were running from SBC/UBL but since it's VSG in Goa no one cares. Also Vasco
...
more...
Patna SF would have already been running daily.

Translate to English
Translate to Hindi

10618 views
0

Mar 22 (09:36)
sunilgaonkar
sunilgaonkar   92 blog posts
Re# 5775370-31              
Thanks for commenting, at least someone understands my plea.
Translate to English
Translate to Hindi

10752 views
0

Mar 22 (09:41)
sunilgaonkar
sunilgaonkar   92 blog posts
Re# 5775370-32               Past Edits
But the VSG - MAS was introduced way back when the second pit line didn't even exist at VSG. It was short terminated only to increase freight traffic without congestion at VSG. Why was the VSG - Jasidih introduced was it the need of the hour then or to fill the vaccum created by VSG - MAS then the same could have been restarted.
Translate to English
Translate to Hindi

9901 views
0

Mar 22 (14:46)
LHB_for_18047~
LHB_for_18047~   10641 blog posts
Re# 5775370-33              
VSG JSME exp additional train introduced now. No one could have opposed the train as huge political pressure was there to introduce it. SWR always opposes VSG SC dedicated train but they couldn't do a thing to oppose JSME exp.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy