Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

No Alcohol No Drugs - the only addiction is Railfanning, to escape the negativity of the world. - Keshav Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 5784514
Posted: Jul 27 2023 (11:50)

9 Responses
Last Response: Jul 28 2023 (17:04)
Travel Question
16051 views
2

Jul 27 2023 (11:50)   BD/Badnera Junction (Amravati) (4 PFs)
Exynos9611~   13891 blog posts
Entry# 5784514            Tags  
A Question Related To Badnera Jn Hope Someone Can Solve It
bd jn has wierd track alignment the main up line of pf ends at bd and the up sideline becomes main line towards wr the down main line becomes loop line and the the up down side line becomes down mainline towards wr
Translate to English
Translate to Hindi

4 Posts

7287 views
1

Jul 27 2023 (13:38)
Exynos9611~   13891 blog posts
Re# 5784514-5               Past Edits
now running jam pack and both 12289/90 tickets are in waiting list from badnera
Translate to English
Translate to Hindi

6173 views
0

Jul 28 2023 (15:43)
sujitNGP~
sujitNGP~   1355 blog posts
Re# 5784514-6               Past Edits
Same doubt in my mind too... this alignment is from long time... couldnt understand why it is so. for this reason only BD had PSR. But may be in future the track alignment will change as some more PFs are coming up.
another logic is: in old days PFs were short and later the length of PF was increased without modifying track alignment
Translate to English
Translate to Hindi

5266 views
0

Jul 28 2023 (16:00)
Exynos9611~   13891 blog posts
Re# 5784514-7              
badnera jn doesnt have double main line in middle and 2 loop lines at at side
akola jn has double main line in middle loop line at sides and seprate loop line for crossing
Translate to English
Translate to Hindi

5102 views
0

Jul 28 2023 (16:02)
Exynos9611~   13891 blog posts
Re# 5784514-8              
even at wardha same allingment like at badnera jn but at wardha jn both main lines don't merge with each other
Translate to English
Translate to Hindi

4830 views
0

Jul 28 2023 (17:04)
Exynos9611~   13891 blog posts
Re# 5784514-9              
badnera jn should have double electric main line middle and pf loop lines at side and seprate goods line
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy