Search Forum
Blog Entry# 5795478
Posted: Aug 11 2023 (10:24)
11 Responses
Last Response: Aug 15 2023 (01:50)
11 Responses
Last Response: Aug 15 2023 (01:50)
6 Posts
MYS SBC in then MG era took 3 hour to 3 hour 15 minutes. Now double track electrificied broad gauge. But same time.
Ditto for UBL MRJ. If no reduction in running time could be achieved, why doubling electrification done? 🤔
Ditto for UBL MRJ. If no reduction in running time could be achieved, why doubling electrification done? 🤔