Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

12567/68 राज्यरानी सुपरफास्ट की धाक राजधानी से कम नहीं है। - Prabhat Sharan

Search Forum
<<prev entry    next entry>>
Blog Entry# 5806484
Posted: Aug 26 2023 (08:33)

4 Responses
Last Response: Sep 03 2023 (23:06)
General Travel
368197 views
6

Aug 26 2023 (08:33)   12876/Neelachal Express (PT) | LKO/Lucknow Charbagh NR (9 PFs)
Sanz~
Sanz~   8513 blog posts
Entry# 5806484            Tags   Past Edits
3 compliments
_/\_ Agree Useful
#KuchNahiBadla
So from LKO my wife decided to go to Delhi while I had to rush home Kumardhubi (Dhanbad).
I booked 12003 Shatabdi for her and 12876 Neelanchal for me.
I was aware that my train arrives earlier but I knew that LKO outer ke kripa se kabhi aisa nahi hoga.
We
...
more...
boarded 12003 train at 3 pm while 12876 had arrived Amausi. Her train departed right time at 3.35pm from LJN and my train guess what was still at Amausi. I walked my way from LJN to LKO which and saw my train scheduled to arrive at 4pm at pf 4 while 13005 was already at pf 4.
So at 4.15 13005 refusing to depart a manual announcement confirmed change of platform 6.
12876 arrived 4.30pm full 1.5 hours late, halted for another half an hour so already 2 hour late thanks to LKO outer issues.
Then it ran slowly till RBL some speed till Pratapgarh and crawled again till Jhanghai halted at outer there for no reason except single track issue maybe.
We pulled up at Lohta at 10.30 pm 5km away from Bsb and then misery began.
First 20504 ot us while after waiting for good 15-20 mins. Then it occupied pf 5 at Bsb the same which we were supposed to occupy as per WheremyTrain. The train halted for close to an hour and started moving at 11.30.
We reached Bsb at 12am midnight so covering a good 300km in 7.5 hours.
We halted there for 20 mins. Then it moved and halted at Kashi and again at NEWC at 12.45 am.
#RajdhaniGang attack
I checked arrivals at Ddu and found that 20840 had already arrived at pf no 1 while 12424 was at JEP. The train again halted for 1 hour meanwhile all Rajdhani ot us halted at Ddu and departed.
We finally entered Ddu at 2 am. While last time I travelled I had caught 12322 from Gmo and 12340 from Dhn-Kmme, this time I hoped to catch 03542/03556 Memu to Kmme from Gmo.
Even in Grand Chord the train did no wonders but still didn't loose any time either.
We arrived at Gmo at 8am delayed by full 3.5 hours jisme saara delay till Ddu tak tha.
Highlights
LKO outer is still a big issue.
Bsb outer is even more pain.
Rajdhani gang will fail u when u are inside it but never when u r outside.

Relief
I had booked 3A from LKO-GMO but my seat got upgraded to 1A
I caught 13308 for Gmo-Dhn that arrived at 8.15 an while it had departed LKO 5 hours earlier at 11.30 am the day before. #LOL

Translate to English
Translate to Hindi

35574 views
0

Aug 26 2023 (08:52)
harshityadav~
harshityadav~   1286 blog posts
Re# 5806484-1              
Varanasi NI work will be done in September. That should ease entry/exit.
After that Lucknow maybe next year.

But these two stations still give a lot of pain to passangers.
Translate to English
Translate to Hindi

34155 views
0

Aug 26 2023 (11:17)
iamanshuman
iamanshuman   541 blog posts
Re# 5806484-2              
Sooner transport satelite station will start commencing few trains which in resultant will change the halting station of few trains running in a sequence then it'll be resolved
Translate to English
Translate to Hindi

35760 views
1

Aug 26 2023 (21:04)
Arnab_K~
Arnab_K~   9090 blog posts
Re# 5806484-3              
sab purane members ya toh shadi sudha hai ya shadi kar le rahe, humko vi jaldi number lagana hoga :D
Translate to English
Translate to Hindi

32228 views
2

Sep 03 2023 (23:06)
PankajMishra^~
PankajMishra^~   59101 blog posts
Re# 5806484-5              
1 compliments
Agree
LKO Yard me faltu ke jagah Occupy kar ke rakha hai PF 7 ke baad vaha additional PF bana sakte hai Yard Remodeling ki sabse jyada jarurat iss samay LKO ko hai aur day times me trains bhi chahiye
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy