My Few Questions Related To NCR NER Zone Part 8A Final Part To Uttar Pradesh Railfans From Varanasi Prayagraj Gorakhpur Kanpur Etc North Railway Zone Will Be Covered Later This Time There Are 7 Questions Cuz Both NER And NCR Cover Huge Part So Questions Will Be Increased
1) Why bypass is line is built btw Utratia n Alamnagar(both in LKO), parallel to actual line, though there is not much goods movement there.
1A)...
more... Why Is Lucknow(NER) Called A Jn As Its A Terminus Station
1B) Gomti Nagar Lucknow City Came Under NER Zone How
2) Chilbila station has its ticket counter btw the tracks, Why?
2A) Lucknow Being Capital Of Uttar Pradesh Why Theres No Any Zones Headquarters Pls Explain
2B) Why no route to Ayodhya from Lucknow pertains to LJN or BSB NER, completely under LKO NR.
3) When did the BSB-LKO section became electrified?
3A) When Was Jhansi Kanpur Railway Line Built
3B) In Which Year Coach Mid Life Rehabiltation Centre,MLR Coach Repairing Workshop Wagon Repairing WorkShop C&W Karkhana Was Built In Jhansi
4) Why Bhuteshwar Is Not Called A Jn As One Line Bifurcates From Bhuteshwar To Alwar Jn
4A) Why Bhimsen Jn Khariar Jn Route Doubling Work Going On When Was Doubling Work Started On This Route
5) Why Kanpur Electric Loco Shed Is Situated At Govindpuri Jn Please Explain
5A) Kanpur Being A Central Station How Did Kanpur Got Electric Loco Shed
5B) Why Govindpuri Isnt Called A Jn Please Explain
5C) How Did Sarnath Aurnihar Jn Line Came Under NER Zone
6) Why Kasganj Etah Etah Railway Line Is Being Built
6A) Why Udi Mor Bhandai Railway Line Was Built Please Explain
6B) Khurja Jn Comes Under North Central Railway But How Did Khurja City Came Under Northern Railway Please Explain
7) In Which Year Gonda Diesel Loco Shed Was Established
7B) Why Theres No Doubling From Daliganj To Sitapur Jn Pls Explain
7C) Why Madhosingh Chilh Railway Line is Abandoned By NER Zone Why No Guage Conversion Of This Railway Line Is It Possible To Extend This Railway Line Till Mirzapur
7D) How Did Kanpur Bridge Left Bank Came Under Northern Railway Zone
please wait...Translate to EnglishMy few questions about NCR NER zone part 8A, final part, to all the Railfans from Varanasi, Prayagraj, Gorakhpur, Kanpur, etc. North Railway Zone will be covered later. This time there are 7 questions because both NER and NCR cover a huge area, so the number of questions will increase.
1) Why is a bypass line built between Utratia and Alamnagar (both in LKO), parallel to the actual line, even though there is not much goods movement there?
1A) Why is Lucknow (NER) called a "Jn" as it is a terminus station?
1B) How did Gomti Nagar Lucknow City come under NER Zone?
2) Why does Chilbila station have its ticket counter between the tracks? Why?
2A) Being the capital of Uttar Pradesh, why doesn't Lucknow have any Zone Headquarters? Please explain.
2B) Why is there no route to Ayodhya from Lucknow that pertains to LJN or BSB NER? It is completely under LKO NR.
3) When was the BSB-LKO section electrified?
3A) When was the Jhansi-Kanpur Railway Line built?
3B) In which year was the Coach Midlife Rehabilitation Centre, MLR Coach Repairing Workshop, Wagon Repairing Workshop C&W Karkhana built in Jhansi?
4) Why isn't Bhuteshwar called a "Jn" when one line bifurcates from Bhuteshwar to Alwar Jn?
4A) Why is the Bhimsen Jn-Khariar Jn route doubling work going on? When was the doubling work started on this route?
5) Why is the Kanpur Electric Loco Shed situated at Govindpuri Jn? Please explain.
5A) Being a central station, how did Kanpur get an electric loco shed?
5B) Why isn't Govindpuri called a "Jn"? Please explain.
5C) How did the Sarnath-Aurnihar Jn line come under NER Zone?
6) Why is the Kasganj-Etah-Etah Railway Line being built?
6A) Why was the Udi Mor Bhandai Railway Line built? Please explain.
6B) Khurja Jn comes under North Central Railway, but how did Khurja City come under Northern Railway? Please explain.
7) In which year was the Gonda Diesel Loco Shed established?
7B) Why is there no doubling from Daliganj to Sitapur Jn? Please explain.
7C) Why was the Madhosingh Chilh Railway Line abandoned by NER Zone? Why was there no gauge conversion of this railway line? Is it possible to extend this railway line till Mirzapur?
7D) How did the Kanpur Bridge Left Bank come under the Northern Railway Zone?
please wait...Translate to HindiMere kuch sawaal NCR NER Zone Part 8A se sambandhit hai Uttar Pradesh Railfans se Varanasi, Prayagraj, Gorakhpur, Kanpur aadi kshetron ke liye. Uttar Railway Zone ka vistar bad mein kiya jayega is baar 7 sawaal hai kyunki NER aur NCR dono bahut bade hisse ko cover karte hai.
1) Utratia aur Alamnagar ke beech bypass line kyun banayi gayi hai, jabki vahan par bahut kam maal ki gati hai?
1A) Lucknow(NER) ko Jn kyun kaha jata hai, jabki yeh ek ant railway station hai?
1B) Gomti Nagar Lucknow City NER Zone mein kaise aaya?
2) Chilbila station ka ticket counter tracks ke beech kyun hai?
2A) Uttar Pradesh ki rajdhani hone ke bavjood Lucknow mein kissi zone ki headquarters kyun nahi hai, pls samjha do?
2B) Lucknow se Ayodhya ki koi route LJN ya BSB NER mein kyun nahi hai, puri tarahse LKO NR mein hai?
3) BSB-LKO section kab electrified hua?
3A) Jhansi Kanpur Railway Line kab bani?
3B) Jhansi mein Coach Mid-Life Rehabilitation Centre, MLR Coach Repairing Workshop Wagon Repairing Workshop C&W Karkhana kab banaya gaya?
4) Bhuteshwar ko Jn kyun nahi kaha jata, jab ki Alwar Jn ke taraf se ek line bhi Bhuteshwar se bifurcate hoti hai?
4A) Bhimsen Jn Khariar Jn route ke doubling kaam kab shuru hua aur abhi tak kyun chal raha hai?
5) Kanpur Electric Loco Shed Govindpuri Jn par kyun sthit hai, pls samjha do?
5A) Kanpur ek central station hone ke bawjood Kanpur ko electric loco shed kaise mili?
5B) Govindpuri ko Jn kyun nahi kaha jata, pls samjha do?
5C) Sarnath Aurnihar Jn line NER Zone ke andar kaise aaya?
6) Kasganj Etah Etah Railway Line kyun ban rahi hai?
6A) Udi Mor Bhandai Railway Line kyun banayi gayi, pls samjha do?
6B) Khurja Jn North Central Railway ke andar aata hai, lekin Khurja City Northern Railway ke andar kaise aaya, pls samjha do?
7) Gonda Diesel Loco Shed ka visheshan kab sthapit hua?
7B) Daliganj se Sitapur Jn tak doubling kyun nahi hai, pls samjha do?
7C) Madhosingh Chilh Railway Line NER Zone dvara kyun chhodi gayi hai, is railway line ki gauge conversion kyun nahi hui, kya yeh railway line Mirzapur tak badhai ja sakti hai?
7D) Kanpur Bridge Left Bank kaise Northern Railway Zone ke andar aaya?