Search Forum
Blog Entry# 5808427
Posted: Aug 28 2023 (16:13)
6 Responses
Last Response: Aug 31 2023 (21:50)
6 Responses
Last Response: Aug 31 2023 (21:50)
Aug 28 2023 (16:13) 13351/Dhanbad - Alappuzha Express (PT) | BZA/Vijayawada Junction (10 PFs)
SaiRBRTRailway~
SaiRBRTRailway~ 3431 blog posts1 Posts
Vellaki timing ee telidu ee month antha marriage season and next dasara vundi Aina works avatle why haven't they fasten up things in past 2 months when there is lean season they should have cancelled more trains and should have finished all works in June itself
They have extended cancellations of Uday and Simhadri upto Monday. There are diversions of Alleppy exp, Hatia Erkm/ Benguluru slots trains till September end.
Now I feel they won't gonna speed up 130 KMPH trains with all these works and Heavy Freight speedup of trains are not possible
I had expected trains trains will do vskp bza in 5.5 hours and bza Gdr in 4hours with 130 KMPH but I don't see that coming into reality
I had expected trains trains will do vskp bza in 5.5 hours and bza Gdr in 4hours with 130 KMPH but I don't see that coming into reality
I personally experienced it the train cruisng at 130kmph covered 96km in 1hr 7min from DVD to Annavaram with a brief halt zero speed halt at Elamanchili outer but took 6hrs to reach Vja from Vskp with 3 regular stops of which 20mins is wasted in Mustabad Vja PF.
Same happened with me plenty of times once while traveling in CBE JP Exp Almost Did MAS GDR in 2hours but slowed near gdr and 20min delay is added this happens near bza ndd as well experienced with Circar Vikramasimhapuri ICE done BZA GDR in 3h53min or so once I with 7 stops so i thought 4 hour bza Gdr is possible for stop heavy trains and 3h30 min for limited stop trains for me 10 min Speed up is possible for every 100KM once the route is upgraded to 130 KMPH bza Gdr is 293 KM so 30 min Speedup is possible and 35 min is possible between BZA vskp,bza sc routes