Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Pamban Sethu - இது தான் நம்முடைய ராமர் சேது - Darnish C

Search Forum
<<prev entry    next entry>>
Blog Entry# 5815619
Posted: Sep 06 2023 (17:31)

11 Responses
Last Response: Dec 22 2023 (17:14)
Info Update
78110 views
9

Sep 06 2023 (17:31)   RPH/Rampurhat Junction (6 PFs)
SAPTARSHI^~
SAPTARSHI^~   26506 blog posts
Entry# 5815619            Tags   Past Edits
*CRS INSPECTION OVER NEWLY COMMISSIONED 3RD LINE SECTION BETWEEN RAMPURHAT & CHATRA*

Speed trial @120KMPH
Power: 30557/HWH , Standby: 37273/HWH

Kolkata,
...
more...
September 06, 2023:

Shri Suvomoy Mitra, Commissioner of Railway Safety (CRS)/Eastern Circle inspected newly commissioned 3rd line between Rampurhat & Chatra on 6.09.2023.
Rampurhat & Chatra is a double line electrified section of Eastern Railway’s Howrah Division with Multi Aspect Colour Light Signalling (MACL) having a length of 22.64 Kms. This Railway line from Sahibganj Loop was extended up to Kiul via Rampurhat in the year of 1866. Rampurhat is the principal gateway of all Northeast bounding trains. This section involves the operation of both Mail/Express, and primarily goods. Proposal for construction of 3rd line between Rampurhat and Chatra has been sanctioned at a cost of 218.03Crs. This eagerly awaited commissioning of 3rd line between Rampurhat & Chatra stations over Howrah Division has completed ahead of schedule on September 06, 2023, will definitely bring more mobility at North-East & North-Bengal bound rail link with added capacity.

This achievement of speedy commissioning of 3rd line between Rampurhat & Chatra follows meticulous safety inspections and speed trials, overseen by Shri Suvomoy Mitra, Commissioner of Railway Safety (CRS)/Eastern Circle. As a part of the inspection today, Shri Mitra, Commissioner of Railway Safety conducted motor trolley inspection in between Rampurhat and Chatra stations on the newly constructed lines wherein, bridges, Railway Track fittings, P-way assets, Electronic inter-locking, relay rooms, cabin, level crossing gates and stations were also inspected. Shri Suvomoy Mitra, Commissioner of Railway Safety (CRS)/Eastern Circle also conducted the speed trail between Rampurhat and Chatra. Shri P.K. Sharma, Chief Administrative Officer (Construction)/ Eastern Railway, Shri Sanjeev Kumar, Divisional Railway Manager/ Howrah and other senior officers of Eastern Railway Headquarters and Howrah Division accompanied Shri Mitra during this inspection.

Notably, the daunting challenge was admirably surmounted. The section features strategically positioned stations, including Rampurhat Jn, Swadinpuri, Nalhati and Chatra. Each of these underwent station yard modifications with blocks taken earlier with non-interlocked working in conjunction with the commissioning of the 3rd line. Additionally, the project encompassed pivotal tasks such as Interlocking, Signalling, and Overhead Equipment (OHE) Modification etc.

Translate to English
Translate to Hindi

6 Posts

16093 views
0

Sep 08 2023 (19:11)
DMail^~
DMail^~   6991 blog posts
Re# 5815619-7              
Clearance to ese gache CRS. But operational speed r stipulation ki ki add koreche seta kibhabe Jana jabe?
Translate to English
Translate to Hindi

15393 views
0

Sep 08 2023 (19:12)
DMail^~
DMail^~   6991 blog posts
Re# 5815619-8              
Any info regarding stipulations and operational speed?
Translate to English
Translate to Hindi

15381 views
0

Sep 08 2023 (19:39)
SAPTARSHI^~   26506 blog posts
Re# 5815619-9              
Operational speed ta CRS er authorisation letter e dewa thakbe, jeta immediately Caution order e reflected hobe. Guard/driver/notice station er SM er kache pawa jabe ei caution order
Translate to English
Translate to Hindi

14149 views
0

Sep 08 2023 (20:13)
DMail^~
DMail^~   6991 blog posts
Re# 5815619-10              
Ok.
Apni jdi pan tahale ektu deben
Translate to English
Translate to Hindi

51875 views
0

Dec 22 2023 (17:14)
SAPTARSHI^~   26506 blog posts
Re# 5815619-11            Tags   Past Edits
Murarai  
CRS INSPECTION OVER NEWLY COMMISSIONED 3RD LINE SECTION BETWEEN CHATRA & MURARAI on 21.12.23

Max speed achieved by Light Engine Trial: 130kmph with power 30508/WAP7/HWH on 20.12.23

Max speed achieved by CRS/Insp Spl:
...
more...
125kmph with power 30189/WAP5/HWH + 13 ICF coach on 21.12.23

Diesel standby: 11333/HWH

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy