Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Yeh dil maange more (RailFans, while ending their trip) - Kirti Solanki

Search Forum
<<prev entry    next entry>>
Blog Entry# 5834258
Posted: Sep 29 2023 (14:40)

15 Responses
Last Response: Sep 30 2023 (13:23)
General Travel
16877 views
0

Sep 29 2023 (14:40)   20678/Vijayawada - MGR Chennai Central Vande Bharat Express
vijaybharadwajs~
vijaybharadwajs~   1996 blog posts
Entry# 5834258            Tags  
Instead of keeping 3 hrs idle at BZA it can start from NS.
Translate to English
Translate to Hindi

14 Posts

4897 views
1

Sep 30 2023 (13:23)
deepak.yerr~
deepak.yerr~   6301 blog posts
Re# 5834258-19               Past Edits
On main line BZA RJY 150km is given 1hr 55 mins and it's taking 1hr 50mins on daily basis without stop. Then 140km with stops how it will given that speed and running time. Whatever PSR km is there in BZA RJY section even NSP have same PSR km. So can be given max 1hr 45 min. If upto BVRM JN it's ok that too they need to speedup upto BZA by 20 mins. Utilisation does not mean running the train with 20%-30% occupancy for 100+km then it will not recover operational and incremental maintenance costs. Already they are such VB running and wasting resources of IR.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy