Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Gujarat Mail - as good as Undhiyu

Search Forum
<<prev entry    next entry>>
Blog Entry# 5837651
Posted: Oct 01 2023 (19:15)

No Responses Yet
General Travel
39717 views
0

Oct 01 2023 (19:15)   DPS/Dangoaposi (2 PFs)
Gyanendra~
Gyanendra~   384 blog posts
Entry# 5837651            Tags  
The Platform No. 1 is being elongated as to be able to incorporate long trains. Presently Platform No. 2 is the main Platform and trains are always placed in Platform No. 2 if it is empty. Trains are placed in Platform No. 1 only when Platform No. 2 is occupied. The length of both platforms are currently are such as to incorporate engine + 13 coaches of a passenger train. So when longer trains halt here, all the coaches after 13 coaches remain out of platform. Platform No. 2 has crossings to other lines on both the Eastern as well as Western sides and the Platform has already been extended to the maximum possible length. So it cannot be elongated further without remodelling the lines. But Platform No. 1 has room on the western side. It is presently being elongated on the western side. It will provide ease and confirm to...
more...
the passengers.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy