Search Forum
Blog Entry# 5846015
Posted: Oct 07 2023 (22:36)
22 Responses
Last Response: Oct 08 2023 (13:08)
22 Responses
Last Response: Oct 08 2023 (13:08)
Oct 07 2023 (22:36) 12779/Goa Express (PT) | NZM/Hazrat Nizamuddin (9 PFs)Yusuf_Azhar^ 52032 blog posts
Originally , it is a just 15 coaches train..
The train connecting the capital city has so few coaches, it is sad to see all this.!
:-(
The train connecting the capital city has so few coaches, it is sad to see all this.!
:-(
17 Posts
Uske liye pehle inko pitline toh commission karne do VSG pe 22 LHB ke PM ke liye.
Their RTI early this year said it's commissioned but this pic of mine on 15 June 2023 you can clearly see on the other end of the 2nd pitline there is no sidewalk constructed.
Their RTI early this year said it's commissioned but this pic of mine on 15 June 2023 you can clearly see on the other end of the 2nd pitline there is no sidewalk constructed.
They should run a Full AC train daily on the route of Goa Express with less stoppages and increase the Sleeper coaches in Goa Express.
Despite having a lot of 3rd AC coaches, this train runs Jam packed throughout the year, waiting is there even before 3 months of journey so a new Full AC train is badly required.
If...
more...
Despite having a lot of 3rd AC coaches, this train runs Jam packed throughout the year, waiting is there even before 3 months of journey so a new Full AC train is badly required.
If...
more...
IR could've revamped it's TT in this year's TAAG. It was a perfect opportunity they could've placed it between AP and TN and to reduce congestion at BPL they could've changed the halt to RKMP, it is already doing 130 KMPH in WCR so why not.
Even some ICF trains like Kalka SNSI SF are faster than this train. Such a pathetic TT it has.
Gondwana with twice the number of halts compared to this train does a scheduled OT on the way to NZM.
Such nonsense.
Don't know why they did rake standardization of this train if they don't intend to speed it up. In return for...
more...
Gondwana with twice the number of halts compared to this train does a scheduled OT on the way to NZM.
Such nonsense.
Don't know why they did rake standardization of this train if they don't intend to speed it up. In return for...
more...
OTs faced by 12779 post Jhansi.
12780 situation is even more embarrassing.
I don't think there is any other SF train in IR facing such as pathetic treatment inspite of having so less halts and LHB rakes.
12780 situation is even more embarrassing.
I don't think there is any other SF train in IR facing such as pathetic treatment inspite of having so less halts and LHB rakes.