Search Forum
Blog Entry# 5893292
Posted: Nov 25 2023 (16:01)
4 Responses
Last Response: Dec 01 2023 (09:22)
4 Responses
Last Response: Dec 01 2023 (09:22)
Other News
ECR/East Central
rhythmsofrail^~ 866 news posts
East Central Railways: रेलवे समय-समय पर अपनी सुविधा के अनुसार ट्रेन के समय में बदलाव और ट्रेन कैंसिल करती है. मिली जानकारी के अनुसार, धनबाद...
With this 23 km strech now SGRL CPU RNQ GHD ( SINGRAULI GARHWA ROAD) section is 85 % doubled.
Apart from this the doubling has started on obra rail bridge.
Apart from this the doubling has started on obra rail bridge.
Mahuariya duddhi v final stage me hai obra or ye dono ek sath dec end me commissioned ho jayenge
Obra bridge 100% nahi poora hoga December tak, abhi tak sirf ek span bana hai. /blog/post/5893324